Project Details
This page displays current information for project DEA: 04235624.
Project Information
Project Identifiers | Project ID: 209187 DEA: 04235624 EFIS: 0400000678 COOP: 042583 |
---|---|
DIST-CO-RTE-PM | 04-SCL,SM-101-52.0/52.6,0.0/0.6 |
Award Date | 04/28/2015 |
Closeout Date | 01/08/2020 |
Work Description | BRIDGE REPLACEMENT |
Location Description | SANTA CLARA AND SAN MATEO COUNTIES IN PALO ALTO AND EAST PALO ALTO FROM OREGON EXPRESSWAY OVERCROSSING TO 0.3 MILE SOUTH OF UNIVERSITY AVENUE OVERCROSSING |
QA Service Level | 1 (Verified on 12/11/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
fernando.abela@dot.ca.gov | Fernando Abela | Resident Engineer | Caltrans RE DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 109 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2017-09-14-16 | 09/14/2017 | 09/14/2017 | Quality Control | Aggregate | View |
2017-09-26-8 | 09/26/2017 | 09/26/2017 | Quality Control | Aggregate | View |
2015-09-10-2 | 09/10/2015 | Verification | Concrete | View | |
2015-09-10-3 | 09/10/2015 | 09/15/2015 | Verification | Concrete | View |
2015-09-10-4 | 09/10/2015 | 09/11/2015 | Quality Control | Concrete | View |
2015-09-14-3 | 09/14/2015 | 09/15/2015 | Quality Control | Concrete | View |
2015-09-23-5 | 09/23/2015 | 09/28/2015 | Verification | Concrete | View |
2015-09-23-8 | 09/23/2015 | 09/28/2015 | Verification | Concrete | View |
2015-09-22-9 | 09/22/2015 | 09/23/2015 | Quality Control | Concrete | View |
2015-09-22-10 | 09/22/2015 | 09/23/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods