Project Details
This page displays current information for project DEA: 100X2104.
Project Information
Project Identifiers | Project ID: 209170 DEA: 100X2104 EFIS: 1012000181 |
---|---|
DIST-CO-RTE-PM | 10-ALP,AMA,CAL-70,162-Var |
Award Date | 01/23/2014 |
Closeout Date | 04/09/2018 |
Work Description | CONSTRUCT WASH BUILDINGS. |
Location Description | ALPINE, AMADOR, AND CALAVERAS COUNTIES AT VARIOUS LOCATIONS |
QA Service Level | 1 (Verified on 12/05/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
colin.doran@dot.ca.gov | Colin Doran | Resident Engineer | Caltrans RE DB |
alfredo.carranza@dot.ca.gov | Alfredo Carranza | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 28 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2015-09-30-4 | 09/30/2015 | 10/02/2015 | Quality Control | Concrete | View |
2015-09-17-6 | 09/17/2015 | 09/22/2015 | Quality Control | Concrete | View |
2015-09-08-5 | 09/08/2015 | 09/22/2015 | Quality Control | Concrete | View |
2015-08-05-4 | 08/05/2015 | 08/18/2015 | Quality Control | Concrete | View |
2015-08-03-9 | 08/03/2015 | 08/18/2015 | Quality Control | Concrete | View |
2015-07-28-8 | 07/28/2015 | 08/18/2015 | Quality Control | Concrete | View |
2015-06-23-7 | 06/23/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-06-16-7 | 06/16/2015 | 06/30/2015 | Quality Control | Concrete | View |
2015-06-08-2 | 06/08/2015 | 06/11/2015 | Quality Control | Concrete | View |
2015-04-10-6 | 04/10/2015 | 04/20/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods