Project Details
This page displays current information for project DEA: 04265604.
Project Information
Project Identifiers | Project ID: 208959 DEA: 04265604 EFIS: 0400000743 COOP: 042390A1 |
---|---|
DIST-CO-RTE-PM | 04-SM-1-40.64/40.95 |
Award Date | 03/10/2014 |
Closeout Date | 01/29/2018 |
Work Description | REPLACEMENT OF THE EXISTING SAN PEDRO CREEK BRIDGE |
Location Description | ON ROUTE 1 IN SAN MATEO COUNTY |
QA Service Level | 1 (Verified on 03/25/2014) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
charles.koos@dot.ca.gov | Charles Koos | Resident Engineer | Caltrans RE DB |
clifford.law@dot.ca.gov | Clifford Law | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 13 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-10-09-1 | 10/09/2014 | 10/07/2014 | Informational | Concrete | View |
2014-09-08-5 | 09/08/2014 | 10/14/2014 | Verification | Concrete | View |
2014-10-06-2 | 10/06/2014 | 10/14/2014 | Verification | Concrete | View |
2015-01-16-6 | 01/16/2015 | 01/19/2015 | Informational | Concrete | View |
2015-02-03-3 | 02/03/2015 | 02/04/2015 | Informational | Concrete | View |
2015-06-04-6 | 06/04/2015 | 06/10/2015 | Verification | Concrete | View |
2015-06-04-7 | 06/04/2015 | 06/10/2015 | Verification | Concrete | View |
2015-06-05-2 | 06/05/2015 | 06/10/2015 | Verification | Concrete | View |
2015-06-05-3 | 06/05/2015 | 06/10/2015 | Verification | Concrete | View |
2015-07-16-3 | 07/16/2015 | 07/20/2015 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods