Project Details
This page displays current information for project DEA: 060G8504.
Project Information
Project Identifiers | Project ID: 208826 DEA: 060G8504 EFIS: 0600020167 COOP: 061535 Permit Numbers: 0613NMC0437 |
---|---|
DIST-CO-RTE-PM | 06-KER-58-52.7/55.5 |
Award Date | 05/23/2013 |
Closeout Date | 08/27/2018 |
Work Description | Enter upon the State Highway Right-of-way on State Route 58 (SR-58) in Bakersfield near the SR-58/SR-99 Separation at SR-58/Hughes Lane Overcrossing (PM R52.7) to set up, maintain, and remove temporary traffic control necessary in order to construct the C |
Location Description | SR58, Bakersfield |
QA Service Level | 2 (Verified on 07/24/2013) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amarjit.dhaliwal@dot.ca.gov | Amarjit Dhaliwal | Resident Engineer | Caltrans RE DB |
simonj@pbworld.com | Jim Simon | Oversight Resident Engineer | Caltrans REO DB |
eduardo_reyes@dot.ca.gov | Eduardo Reyes | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods