Project Details

This page displays current information for project DEA: 042708U4.

Project Information

Project IdentifiersProject ID: 2087
DEA: 042708U4
EFIS: 0400020622
DIST-CO-RTE-PM04-SM-92,280-6.9/8.0,10.4/11.2
Award DateNot set
Closeout DateNot set
Work DescriptionREPLACEMENT PLANTING
Location DescriptionSAN MATEO COUNTY NEAR SAN MATEO ON ROUTE 92 FROM 0.4 MILE WEST OF ROUTE 280 SEPARATION TO RALSTON AVENUE AND ON ROUTE 280 FROM 0.4 MILE SOUTH OF ROUTE 92 SEPARATION TO 0.4 MILE NORTH OF ROUTE 92 SEPARATION
QA Service Level1 (Verified on 06/25/2012)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
saman.barzegari@dot.ca.govSaman BarzegariMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods