Project Details

This page displays current information for project DEA: 04233794.

Project Information

Project IdentifiersProject ID: 2033
DEA: 04233794
EFIS: 0400000674
COOP: 042187
DIST-CO-RTE-PM04-ALA-580-21.04/ 20.91
Award DateNot set
Closeout Date07/12/2019
Work DescriptionBART Dublin/ Pleasanton Pedestrian Bridges and Sign Structure
Location DescriptionConstruct Pedestrian Overcrossing for associated station
QA Service Level2 (Verified on 09/17/2015)

Caltrans Project Personnel

Personnel stored in Caltrans' project databases.

Email AddressFull NameRolePersonnel Source
flor.albano@dot.ca.govFLOR ALBANOResident EngineerCaltrans RE DB
Ivan.Khoshnevis@am.jll.comIvan KhoshnevisOversight Resident EngineerCaltrans REO DB
rod_murray@dot.ca.govROD MURRAYStructural RepresentativeCaltrans SR DB
savas.kolankaya@earthtech.comSavas KolankayaOversight Structural RepresentativeCaltrans SRO DB
saman.barzegari@dot.ca.govSaman BarzegariMETS REPCaltrans METS REP DB

Samples

Samples submitted for this project.

Job Mix Formula (JMF)

JMFs associated with this project.

JMF IDStatusSubmitted ByCreated ByDate CreatedLink
No results found.

Environmental Product Declaration (EPD)

EPDs material quantities submitted for this project.

Declaration NumberMaterial TypeVendorSubmitted byQuantity
No results found.

Project Summary Graphs


Samples Taken and Tests performed per Month


Number of Samples

Sample Types

Number of Tests

Test Types

Material Types

Test Methods