Project Details
This page displays current information for project DEA: 041706U4.
Project Information
Project Identifiers | Project ID: 1841 DEA: 041706U4 EFIS: 0400000450 |
---|---|
DIST-CO-RTE-PM | 04-ALA-880-30.0/ 31.0 |
Award Date | 03/25/2009 |
Closeout Date | 01/14/2016 |
Work Description | 5th Avenue Overhead Bridge Replacement |
Location Description | 5th Ave and 880. Â |
QA Service Level | 1 (Verified on 02/09/2012) |
Samples
Samples submitted for this project.
Displaying 1-10 of 17 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2014-08-21-14 | 08/21/2014 | 08/21/2014 | Quality Control | Concrete | View |
2014-08-21-15 | 08/21/2014 | 08/21/2014 | Quality Control | Concrete | View |
2014-08-13-1 | 08/13/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-08-13-2 | 08/13/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-08-04-8643 | 08/04/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-08-04-8644 | 08/04/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-07-31-10385644 | 07/31/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-07-31-10385645 | 07/31/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-07-28-9006109 | 07/28/2014 | 08/20/2014 | Quality Control | Concrete | View |
2014-07-28-9006110 | 07/28/2014 | 08/20/2014 | Quality Control | Concrete | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods