Project Details
This page displays current information for project DEA: 04049074.
Project Information
Project Identifiers | Project ID: 1385 DEA: 04049074 EFIS: 0400000058 |
---|---|
DIST-CO-RTE-PM | 04-CC,SOL-80-13.9/14.2;0.0/0.5 |
Award Date | 02/16/2012 |
Closeout Date | 08/16/2013 |
Work Description | REPLACE TIMBER FENDERS PIERS 2 and 3, PILE, AND RING BEAMS |
Location Description | CONTRA COSTA AND SOLANO COUNTIES AT THE CARQUINEZ BRIDGES |
QA Service Level | 1 (Verified on 03/19/2012) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
asghar.rezaei@dot.ca.gov | Asghar Rezaei | Resident Engineer | Caltrans RE DB |
sean_j_eagen@dot.ca.gov | Sean Eagen | Structural Representative | Caltrans SR DB |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods