Project Details
This page displays current information for project DEA: 061H3404.
Project Information
Project Identifiers | Project ID: 1000649 DEA: 061H3404 EFIS: 0625000042 |
---|---|
DIST-CO-RTE-PM | 06-TUL-99-23.49 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | BRIDGE REPAIR FOR BR #46 0192 |
Location Description | Tulare County along NB SR 99 at Avenue 184 OC, Bridge #46 0192. |
QA Service Level | 1 (Verified on 09/26/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
amir.zamanian@dot.ca.gov | Amir Zamanian | Resident Engineer | Caltrans RE DB |
luis.guzman@dot.ca.gov | Luis Guzman | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-9 of 9 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-10-17-45 | 10/17/2024 | 10/24/2024 | Quality Assurance | Asphaltic Emulsion | View |
2024-10-17-25 | 10/17/2024 | 10/18/2024 | Quality Assurance | Aggregate | View |
2024-10-17-24 | 10/17/2024 | 10/17/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-10-16-18 | 10/16/2024 | 10/17/2024 | Quality Assurance | Aggregate | View |
2024-10-16-17 | 10/16/2024 | 10/17/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-10-15-26 | 10/15/2024 | 10/16/2024 | Quality Assurance | Aggregate | View |
2024-10-15-25 | 10/15/2024 | 10/16/2024 | Quality Assurance | Hot Mix Asphalt | View |
2024-10-14-10 | 10/14/2024 | 10/14/2024 | Quality Assurance | Soil | View |
2024-10-07-15 | 10/07/2024 | 10/07/2024 | Quality Assurance | Soil | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods