Project Details
This page displays current information for project DEA: 081J3004.
Project Information
Project Identifiers | Project ID: 1000606 DEA: 081J3004 EFIS: 0818000016 |
---|---|
DIST-CO-RTE-PM | 08-SBD-18-90.9/R96.6 |
Award Date | 12/06/2024 |
Closeout Date | Not set |
Work Description | HMA (TYPE A), MOD SIGNAL & LTG SYSTEMS, & COLD PLANE AC PVMT. |
Location Description | SAN BERNARDINO COUNTY IN AND NEAR VICTORVILLE FROM APPLE VALLEY INN ROAD TO ROUTE 15/18 SEPARATION |
QA Service Level | 1 (Verified on 01/13/2025) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Alfonso.Gonzalez@dot.ca.gov | Alfonso Gonzalez | Resident Engineer | Caltrans RE DB |
jacob.bailey@dot.ca.gov | Jacob Bailey | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-6 of 6 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-03-25-48 | 03/25/2025 | 04/02/2025 | Verification | Aggregate | View |
2025-03-25-36 | 03/25/2025 | 04/02/2025 | Verification | Asphalt Binder | View |
2025-03-25-34 | 03/25/2025 | 04/02/2025 | Verification | Hot Mix Asphalt | View |
2025-02-03-10 | 02/03/2025 | 02/05/2025 | Verification | Asphalt Binder | View |
2025-02-03-8 | 02/03/2025 | 02/05/2025 | Verification | Hot Mix Asphalt | View |
2025-02-03-7 | 02/03/2025 | 02/05/2025 | Verification | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods