This page displays current information for project DEA: 051Q03U4.
Project Information
Project Identifiers | Project ID: 1000540 DEA: 051Q03U4 EFIS: 0524000192 |
---|---|
DIST-CO-RTE-PM | 05-SLO,KER-46-60.3/60.8,0.0/0.4 |
Award Date | 12/13/2024 |
Closeout Date | Not set |
Work Description | VERTICAL CURVE AND EXTEND EXISTING TRUCK CLIMBING LANE. |
Location Description | SAN LUIS OBISPO AND KERN COUNTIES NEAR CHOLAME FROM 2.0 MILES EAST OF ANTELOPE ROAD TO 0.4 MILE EAST OF THE KERN COUNTY LINE. |
QA Service Level | 1 (Verified on 09/09/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
andrew.borrelli@dot.ca.gov | Andrew Borelli | Resident Engineer | Caltrans RE DB |
saman.barzegari@dot.ca.gov | Saman Barzegari | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 11 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-06-27-28 | 06/27/2025 | 07/10/2025 | Dispute Resolution | Aggregate | View |
2025-06-10-103 | 06/10/2025 | 06/11/2025 | Acceptance | Concrete | View |
2025-07-03-11 | 07/03/2025 | 07/03/2025 | Acceptance | Aggregate | View |
2025-06-30-21 | 06/30/2025 | 06/30/2025 | Acceptance | Aggregate | View |
2025-06-27-20 | 06/27/2025 | 06/27/2025 | Acceptance | Aggregate | View |
2025-06-27-19 | 06/27/2025 | 06/27/2025 | Acceptance | Aggregate | View |
2025-06-26-27 | 06/26/2025 | 06/26/2025 | Acceptance | Aggregate | View |
2025-06-26-25 | 06/26/2025 | 06/26/2025 | Acceptance | Aggregate | View |
2025-06-24-30 | 06/24/2025 | 06/24/2025 | Acceptance | Aggregate | View |
2025-06-16-5 | 06/16/2025 | 06/16/2025 | Acceptance | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods