Project Details
This page displays current information for project DEA: 010P2604.
Project Information
Project Identifiers | Project ID: 1000521 DEA: 010P2604 EFIS: 0124000213 |
---|---|
DIST-CO-RTE-PM | 01-MEN-101-59.9 |
Award Date | 07/01/2024 |
Closeout Date | Not set |
Work Description | Bridge Deck Replacement |
Location Description | Long Valley Creek Bridge |
QA Service Level | 1 (Verified on 08/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
roozbeh.hadipour@dot.ca.gov | Roozbeh Hadipour | Resident Engineer | Caltrans RE DB |
behdad.saebi@dot.ca.gov | Behdad Saebi | Structural Representative | Caltrans SR DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-2 of 2 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-01-13-1 | 01/13/2025 | 01/13/2025 | Acceptance | Roadway/Bridge Surface | View |
2024-11-01-58 | 11/01/2024 | 11/26/2024 | Quality Assurance | SMTL TM5 - Couplers | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods