Project Details
This page displays current information for project DEA: 072XL904.
Project Information
Project Identifiers | Project ID: 1000485 DEA: 072XL904 EFIS: 0724000184 |
---|---|
DIST-CO-RTE-PM | 07--- |
Award Date | 01/18/2024 |
Closeout Date | Not set |
Work Description | Not set |
Location Description | Not set |
QA Service Level | 1 (Verified on 07/30/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Akram.M.Hanna@dot.ca.gov | Akram Hanna | Resident Engineer | Caltrans RE DB |
Saleem.Toon@dot.a.gov | Saleem Toon | Structural Representative | Caltrans SR DB |
jeffrey.yu@dot.ca.gov | Jeffrey Yu | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-3 of 3 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-30-3 | 07/30/2024 | 07/31/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-07-30-2 | 07/30/2024 | 07/31/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
2024-07-30-1 | 07/30/2024 | 07/31/2024 | Quality Assurance | SMTL TM3 - Fastener Assembly | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods