Project Details
This page displays current information for project DIME:1000388.
Project Information
Project Identifiers | Project ID: 1000388 Permit Numbers: 0420NMC2245 0423NRW8322 |
---|---|
DIST-CO-RTE-PM | 04-SM-84-25.9/26.1 |
Award Date | Not set |
Closeout Date | Not set |
Work Description | Perform roadway reconstruction; bike lane enhancements; signing & striping improvements; traffic signal modifications; utility relocations/modifications; drainage modifications; lighting improvements; and construct Bicycle and Pedestrian Bridge (BPOC) |
Location Description | over the Atherton Channel, on State Highway 04-SM-84, Post Mile 25.9 - 26.1, in the City of Menlo Park. |
QA Service Level | 1 (Verified on 06/14/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
No results found. |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods