Project Details
This page displays current information for project DEA: 100V4804.
Project Information
Project Identifiers | Project ID: 1000272 DEA: 100V4804 EFIS: 1013000264 |
---|---|
DIST-CO-RTE-PM | 10-CAL-26-21.8/30.3 |
Award Date | 09/09/2024 |
Closeout Date | Not set |
Work Description | SLOPE STABILIZATION AND CONSTRUCT RETAINING WALL. |
Location Description | CALAVERAS COUNTY NEAR MOKELUMNE HILL AT VARIOUS LOCATIONS FROM 3.6 MILES EAST OF ROUTE 49 TO 0.9 MILE WEST OF WOODHOUSE MINE ROAD |
QA Service Level | 1 (Verified on 04/15/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
jonathan.ngai@dot.ca.gov | Jonathan Ngai | Resident Engineer | Caltrans RE DB |
Conor.Hennessy@dot.ca.gov | Conor Hennessy | Structural Representative | Caltrans SR DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 83 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2025-04-07-98 | 04/07/2025 | 04/07/2025 | Quality Control | Aggregate | View |
2025-04-07-99 | 04/07/2025 | 04/07/2025 | Quality Control | Aggregate | View |
2025-04-07-100 | 04/07/2025 | 04/07/2025 | Quality Control | Aggregate | View |
2025-04-18-56 | 04/18/2025 | 04/18/2025 | Quality Control | Aggregate | View |
2025-04-18-57 | 04/18/2025 | 04/18/2025 | Quality Control | Aggregate | View |
2025-04-18-58 | 04/18/2025 | 04/18/2025 | Quality Control | Aggregate | View |
2025-04-24-64 | 04/24/2025 | 04/24/2025 | Quality Control | Aggregate | View |
2025-04-24-65 | 04/24/2025 | 04/24/2025 | Quality Control | Aggregate | View |
2025-04-24-66 | 04/24/2025 | 04/24/2025 | Quality Control | Aggregate | View |
2025-05-02-49 | 05/02/2025 | 05/02/2025 | Quality Control | Aggregate | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Precast Concrete Forms
Project DEA | DIME Sample ID | Sample Taken Date | Link |
---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods