Project Details
This page displays current information for project DEA: 09392504.
Project Information
Project Identifiers | Project ID: 1000165 DEA: 09392504 EFIS: 0923000029 |
---|---|
DIST-CO-RTE-PM | 09-INY-395-R17.2/25.8 |
Award Date | 06/26/2024 |
Closeout Date | Not set |
Work Description | HOT MIX ASPHALT (TYPE A), SHOULDER BACKING, & STRIPING. |
Location Description | INYO COUNTY ABOUT 9 MILES SOUTH OF OLANCHA FROM 0.8 MILE SOUTH OF SYKES ROAD TO 0.3 MILE NORTH OF HAIWEE CANYON ROAD |
QA Service Level | 1 (Verified on 03/18/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
Garrett.Rottner@dot.ca.gov | Garret Rottner | Resident Engineer | Caltrans RE DB |
joshua.fry@dot.ca.gov | Joshua Fry | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 158 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-08-19-24 | 08/19/2024 | 08/20/2024 | Verification | Hot Mix Asphalt | View |
2024-08-19-25 | 08/19/2024 | 08/20/2024 | Verification | Aggregate | View |
2024-08-19-26 | 08/19/2024 | 08/20/2024 | Verification | Aggregate | View |
2024-08-19-71 | 08/19/2024 | 09/03/2024 | Acceptance | Asphalt Binder | View |
2024-08-20-8 | 08/20/2024 | 08/20/2024 | Verification | Hot Mix Asphalt | View |
2024-08-20-9 | 08/20/2024 | 08/20/2024 | Acceptance | Hot Mix Asphalt | View |
2024-08-20-10 | 08/20/2024 | 08/20/2024 | Verification | Hot Mix Asphalt | View |
2024-08-20-11 | 08/20/2024 | 08/20/2024 | Verification | Aggregate | View |
2024-08-20-12 | 08/20/2024 | 08/20/2024 | Acceptance | Aggregate | View |
2024-08-20-78 | 08/20/2024 | 09/03/2024 | Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods