Project Details
This page displays current information for project DEA: 061F8804.
Project Information
Project Identifiers | Project ID: 1000063 DEA: 061F8804 EFIS: 0623000106 |
---|---|
DIST-CO-RTE-PM | 06-KIN-41-R39.9/R48.3 |
Award Date | 04/03/2024 |
Closeout Date | Not set |
Work Description | COLD PLANE, HMA PAVING, AND INDIVIDUAL CONCRETE SLAB REPLACEMENT. |
Location Description | KINGS COUNTY AT AND NEAR LEMOORE FROM ROUTE 41/198 SEPARATION TO FRESNO COUNTY LINE |
QA Service Level | 1 (Verified on 01/29/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
oscar.sherrill@dot.ca.gov | Oscar Sherrill | Resident Engineer | Caltrans RE DB |
justin.palmaymesa@dot.ca.gov | Justin Palmaymesa | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 31-40 of 44 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-02-10 | 07/02/2024 | 07/01/2024 | Acceptance | Hot Mix Asphalt | View |
2024-07-02-9 | 07/02/2024 | 07/02/2024 | Acceptance | Aggregate | View |
2024-07-01-9 | 07/01/2024 | 07/01/2024 | Acceptance | Hot Mix Asphalt | View |
2024-07-01-8 | 07/01/2024 | 07/01/2024 | Acceptance | Aggregate | View |
2024-06-28-8 | 06/28/2024 | 06/28/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-28-7 | 06/28/2024 | 06/28/2024 | Acceptance | Aggregate | View |
2024-06-27-21 | 06/27/2024 | 06/27/2024 | Acceptance | Aggregate | View |
2024-06-27-19 | 06/27/2024 | 06/27/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-24-60 | 06/24/2024 | 06/24/2024 | Acceptance | Hot Mix Asphalt | View |
2024-06-25-40 | 06/25/2024 | 06/25/2024 | Acceptance | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods