This page displays current information for project DEA: 010H1504.
Project Information
Project Identifiers | Project ID: 1000014 DEA: 010H1504 EFIS: 0117000116 |
---|---|
DIST-CO-RTE-PM | 01-MEN-162-R0.0/25.7 |
Award Date | 03/26/2024 |
Closeout Date | Not set |
Work Description | HMA, RHMA, AND GEOSYNTHETIC PAVEMENT INTERLAYER. |
Location Description | MENDOCINO COUNTY NEAR LONGVALE FROM ROUTE 101 TO 1.1 MILES SOUTH OF POONKINNEY ROAD NEAR COVELO |
QA Service Level | 1 (Verified on 01/10/2024) |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
steve.tisell@dot.ca.gov | Steve Tisell | Resident Engineer | Caltrans RE DB |
peter.gan@dot.ca.gov | Peter Gan | METS REP | Caltrans METS REP DB |
Samples
Samples submitted for this project.
Displaying 1-10 of 14 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-07-18-35 | 07/18/2024 | 07/19/2024 | Acceptance | Asphalt Rubber Binder | View |
2024-07-22-28 | 07/22/2024 | 07/23/2024 | Acceptance | Asphalt Binder | View |
2024-07-30-39 | 07/30/2024 | 08/01/2024 | Acceptance | Asphalt Binder | View |
2024-07-30-44 | 07/30/2024 | 08/05/2024 | Verification | Asphalt Binder | View |
2024-08-01-66 | 08/01/2024 | 08/07/2024 | Verification | Asphalt Binder | View |
2024-08-08-52 | 08/08/2024 | 08/12/2024 | Acceptance | Asphalt Binder | View |
2024-08-08-63 | 08/08/2024 | 08/14/2024 | Acceptance | Asphalt Binder | View |
2024-08-19-36 | 08/19/2024 | 08/19/2024 | Acceptance | Asphalt Binder | View |
2024-08-19-68 | 08/19/2024 | 08/28/2024 | Acceptance | Asphalt Binder | View |
2024-09-11-40 | 09/11/2024 | 09/13/2024 | Acceptance | Asphalt Binder | View |
Job Mix Formula (JMF)
JMFs associated with this project.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
No results found. |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods