Project Details
This page displays current information for project DEA: No Project.
Project Information
Project Identifiers | DEA: No Project |
---|---|
DIST-CO-RTE-PM | --- |
Award Date | Not set |
Closeout Date | 11/01/2022 |
Work Description | Special project identifier for material not associated with a project |
Location Description | Not set |
QA Service Level | NOT VERIFIED |
Caltrans Project Personnel
Personnel stored in Caltrans' project databases.
Email Address | Full Name | Role | Personnel Source |
---|---|---|---|
No results found. |
Samples
Samples submitted for this project.
Displaying 91-100 of 618 results.
DIME Sample ID | Sample Taken Date | Sample Received Date | Sample Type | Material Type | Link |
---|---|---|---|---|---|
2024-04-16-3 | 04/16/2024 | 04/16/2024 | Quality Control | Concrete | View |
2024-04-17-1 | 04/17/2024 | Quality Control | Concrete | View | |
2024-05-13-10 | 05/13/2024 | 05/13/2024 | Quality Control | Concrete | View |
2024-05-12-16 | 05/12/2024 | 05/12/2024 | Quality Control | Concrete | View |
2017-04-20-28 | 04/20/2017 | 04/20/2017 | Quality Control | Hot Mix Asphalt | View |
2017-04-20-33 | 04/20/2017 | 04/20/2017 | Quality Control | Hot Mix Asphalt | View |
2018-02-27-24 | 02/27/2018 | 02/27/2018 | Quality Control | Hot Mix Asphalt | View |
2019-04-01-36 | 04/01/2019 | 04/01/2019 | Quality Control | Hot Mix Asphalt | View |
2019-05-31-9 | 05/31/2019 | 05/31/2019 | Verification | Hot Mix Asphalt | View |
2019-05-31-11 | 05/31/2019 | 05/31/2019 | Verification | Hot Mix Asphalt | View |
Job Mix Formula (JMF)
JMFs associated with this project.
Displaying 1-3 of 3 results.
JMF ID | Status | Submitted By | Created By | Date Created | Link |
---|---|---|---|---|---|
JMF3511-208-2019-122 | Submittal Authorized For Use | Clinton Edmiston | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 11/17/2019 | View |
JMF3511-208-2019-121 | Submittal In Progress | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 11/17/2019 | View | |
JMF3511-208-2019-120 | Submittal Accepted for Verification | Clinton Edmiston | CT HQ - Sacramento Hot Mix Asphalt Laboratory | 11/16/2019 | View |
Environmental Product Declaration (EPD)
EPDs material quantities submitted for this project.
Declaration Number | Material Type | Vendor | Submitted by | Quantity |
---|---|---|---|---|
No results found. |
Project Summary Graphs
Samples Taken and Tests performed per Month
Number of Samples
Sample Types
Number of Tests
Test Types
Material Types
Test Methods