Search for Samples & Test Results

Samples per page
(*)
indicates that the test results are not yet available.
Number of tests: 75988
Displaying 1-100 of 21300 samples
Project SummarySampled DateReceived DateMaterial TypeSampled BySample TypeMaterial IdentificationSample Laboratory IdentificationTest SummaryDIME Sample ID
Project ID: 213682
DEA: 11430184
EFIS: 1117000215
Supplier: Pacific Steel Group
06/02/202006/04/2020SMTL TM5 - Headed BarsCT QASI - Los Angeles Field LaboratoryQuality AssuranceLot no 1 and Lot no 2

2020-06-02-3
Project ID: 213682
DEA: 11430184
EFIS: 1117000215
Supplier: Pacific Steel Group
06/02/202006/04/2020SMTL TM5 - Headed BarsCT QASI - Los Angeles Field LaboratoryQuality AssuranceLot no 1

2020-06-02-4
Project ID: 214465
DEA: 081E5704
EFIS: 0814000051
Supplier: RKR Steel Welding
06/02/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Control1 thru 8

2020-06-02-1
Project ID: 214465
DEA: 081E5704
EFIS: 0814000051
Supplier: RKR Steel Welding
06/02/202006/05/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Assurance1, 4 and 8

2020-06-02-2
Project ID: 214176
DEA: 033F0904
EFIS: 0312000056
Supplier: RKR Steel Welding
06/01/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Control11 thru 20

2020-06-01-1
Project ID: 214176
DEA: 033F0904
EFIS: 0312000056
Supplier: RKR Steel Welding
06/01/202006/05/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Assurance13 and 18

2020-06-01-2
Project ID: 213746
DEA: 080Q75U4
EFIS: 0817000114
Supplier: SHORTLOAD CONCRETE
05/30/202005/20/2020ConcreteCT - Southern Regional Field LaboratoryQuality AssuranceCTS 30 RAM999-530A

2020-05-30-1
Project ID: 213746
DEA: 080Q75U4
EFIS: 0817000114
Supplier: SHORTLOAD CONCRETE
05/30/202005/20/2020ConcreteCT - Southern Regional Field LaboratoryQuality AssuranceCTS 30 RAM999-530B

2020-05-30-2
Project ID: 213746
DEA: 080Q75U4
EFIS: 0817000114
Supplier: SHORTLOAD CONCRETE
05/30/202005/20/2020ConcreteCT - Southern Regional Field LaboratoryQuality AssuranceCTS 30 RAM999-530C

2020-05-30-3
Project ID: 213856
DEA: 112888U4
EFIS: 1118000199
Supplier: RKR Steel Welding
05/29/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Assurance1

2020-05-29-4
Project ID: 213856
DEA: 112888U4
EFIS: 1118000199
Supplier: RKR Steel Welding
05/29/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Assurance2

2020-05-29-5
Project ID: 213856
DEA: 112888U4
EFIS: 1118000199
Supplier: RKR Steel Welding
05/29/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Control1-2

2020-05-29-6
Project ID: 214176
DEA: 033F0904
EFIS: 0312000056
Supplier: RKR Steel Welding
05/29/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality Control3-10

2020-05-29-2
Project ID: 214176
DEA: 033F0904
EFIS: 0312000056
Supplier: RKR Steel Welding
05/29/2020SMTL TM5 - Welded HoopsCT QASI - Los Angeles Field LaboratoryQuality AssuranceLot 9

2020-05-29-3
Project ID: 99999
DEA: 0322222
Supplier: epoxy people
05/29/202005/29/2020High Friction Surface TreatmentCT HQ - Sacramento Concrete Testing LaboratoryQuality ControlEpoxy

2020-05-29-1
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: Geofortis
05/28/202005/28/2020CementitiousCT HQ - Sacramento Cement Testing LaboratoryAnnual Source TestingGeofortisCM205022

2020-05-28-3
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: RED Industries
05/28/202005/28/2020CementitiousCT HQ - Sacramento Cement Testing LaboratoryAnnual Source TestingRED Industrial ProductsCM205030

2020-05-28-4
Project ID: 213856
DEA: 112888U4
EFIS: 1118000199
Supplier: Blue Circle Corp
05/28/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryQuality Assurance

2020-05-28-1
Project ID: 213856
DEA: 112888U4
EFIS: 1118000199
Supplier: Blue Circle Corp
05/28/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryQuality Assurance

2020-05-28-2
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: AAA-Corona
05/28/202005/29/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceRHMA-G

2020-05-28-6
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: AAA-Corona
05/28/202005/29/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceRHMA-G

2020-05-28-7
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/28/202005/29/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-28-8
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/28/202005/29/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-28-9
Project ID: 214587
DEA: 101J1604
EFIS: 1018000180
Supplier: Pacific Northwest Oil - Stockton, CA
05/28/202005/29/2020Asphaltic EmulsionCT HQ - Sacramento Asphalt Binder LaboratoryAcceptanceSS-1h

2020-05-28-5
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Collected at jobsite
05/27/202005/28/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1555974

2020-05-27-13
Project ID: 211848
DEA: 112T2174
EFIS: 1116000131
Supplier: CMC San Bernardino
05/27/2020SMTL TM5 - Headed BarsCT - Unassigned/General Field LaboratoryQuality Assurance7, 8

2020-05-27-1
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: UIS
05/27/2020SMTL TM3 - Fastener AssemblyCT QASI - Sacramento Field LaboratoryQuality Assurance

2020-05-27-2
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: UIS
05/27/2020SMTL TM3 - Fastener AssemblyCT QASI - Sacramento Field LaboratoryQuality Assurance

2020-05-27-3
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087300

2020-05-27-10
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087200, AAAM087225, AAAM087250, AAAM087275, AAAM087300

2020-05-27-11
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087200, AAAM087225, AAAM087250, AAAM087275, AAAM087300

2020-05-27-12
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087200

2020-05-27-6
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087225

2020-05-27-7
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087250

2020-05-27-8
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: St Louis Screw and Bolt
05/27/2020SMTL TM3 - Fastener AssemblyCaltrans Vallejo Field LaboratoryAcceptanceAAAM087275

2020-05-27-9
Project ID: 214601
DEA: 041J5694
EFIS: 0419000313
Supplier: Madden Bolt
05/27/202005/27/2020SMTL TM3 - Fastener AssemblyCT HQ - Sacramento Office of Structural Materials Field LaboratoryQuality AssuranceN/A

2020-05-27-4
Project ID: 214601
DEA: 041J5694
EFIS: 0419000313
Supplier: Madden Bolt
05/27/202005/27/2020SMTL TM3 - Fastener AssemblyCT HQ - Sacramento Office of Structural Materials Field LaboratoryQuality AssuranceN/A

2020-05-27-5
Project ID: 214587
DEA: 101J1604
EFIS: 1018000180
Supplier: Pacific Northwest Oil - Stockton, CA
05/27/202005/29/2020Asphaltic EmulsionCT HQ - Sacramento Asphalt Binder LaboratoryAcceptanceSS-1h

2020-05-27-14
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: GCC
05/26/202005/26/2020CementitiousCT HQ - Sacramento Cement Testing LaboratoryControl SampleGCC of AmericaCM209002

2020-05-26-4
Project ID: 214131
DEA: 080N69U4
EFIS: 0812000307
COOP: 081635
Supplier: All American Asphalt Perris
05/26/202005/27/2020AggregateCT - Southern Regional Field LaboratoryVerification91-33-0005::ALL AMERICAN ASPHALT0277A-20

2020-05-26-5
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Kie-Con Antioch
05/26/202005/27/2020ConcreteCaltrans Vallejo Field LaboratoryQuality AssuranceK6080-603

2020-05-26-6
Project ID: 214190
DEA: 024G41U4
EFIS: 0218000047
Supplier: Kie-Con Antioch
05/26/202005/27/2020ConcreteCaltrans Vallejo Field LaboratoryQuality AssuranceK6065-604

2020-05-26-7
Project ID: 210673
DEA: 042640F4
EFIS: 0400020132
COOP: 042308A3
Supplier: Pacitic Steel group Nucor HRC
05/26/202005/26/2020SMTL TM5 - CouplersCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance 

1:CTM--670 vDecember 2013 (cyclical with slip) *
CT HQ - Sacramento Structural Materials Testing Laboratory
2:CTM--670 vDecember 2013 (cyclical with slip) *
CT HQ - Sacramento Structural Materials Testing Laboratory
3:CTM--670 vDecember 2013 (cyclical with slip) *
CT HQ - Sacramento Structural Materials Testing Laboratory
4:CTM--670 vDecember 2013 (cyclical with slip) *
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-26-1
Project ID: 214245
DEA: 11404604
EFIS: 1114000049
Supplier: CMC Rebar Erico Lenton
05/26/202005/29/2020SMTL TM5 - CouplersCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance 

1:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
4:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-26-8
Project ID: 211848
DEA: 112T2174
EFIS: 1116000131
Supplier: CMC Etiwanda
05/26/2020SMTL TM5 - Welded HoopsCT - Unassigned/General Field LaboratoryQuality Assurance38 through 46

2020-05-26-2
Project ID: 212112
DEA: 080C2514
EFIS: 0816000076
COOP: 081645
Supplier: CMC Etiwanda
05/26/2020SMTL TM5 - Welded HoopsCT - Unassigned/General Field LaboratoryQuality Assurance1, 2, 3

2020-05-26-3
Project ID: 208945
DEA: 07288604
EFIS: 0700021080
COOP: 074663
Supplier: Kwik Bond Polymers and Reichhold
05/26/202005/26/2020PolyesterKwik Bond PolymersQuality Control1254562

2020-05-26-10
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: AAA-Corona
05/26/202005/27/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceRHMA-G

2020-05-26-11
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: AAA-Corona
05/26/202005/27/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceRHMA-G

2020-05-26-12
Project ID: 212789
DEA: 044H5804
EFIS: 0413000162
Supplier: Reed and Graham, Inc
05/26/202005/28/2020Asphaltic EmulsionCT HQ - Sacramento Asphalt Binder LaboratoryAcceptanceSS-1h

2020-05-26-9
Project ID: 215016
DEA: 051M5904
EFIS: 0520000032
Supplier: Mother Earth
05/22/202005/22/2020SoilCT D05 - Field LaboratoryInformationalUnknownD5 20-D-021

1:CTM--643 vApril 2020 (Resistivity)
CT D05 - Field Laboratory

2020-05-22-10
Project ID: 215016
DEA: 051M5904
EFIS: 0520000032
Supplier: Mother Earth
05/22/202005/22/2020SoilCT D05 - Field LaboratoryInformationalUnknownD5 20-D-022

1:CTM--643 vApril 2020 (Resistivity)
CT D05 - Field Laboratory

2020-05-22-11
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/22/202005/26/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604645

2020-05-22-3
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/22/202005/26/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604795

2020-05-22-4
Project ID: 214449
DEA: 030H3414
EFIS: 0317000152
Supplier: Jobsite
05/22/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality AssuranceCT072CR5WA

1:ASTM-C-39 v17a (compressive strength)
CT HQ - Sacramento Concrete Testing Laboratory

2020-05-22-1
Project ID: 214449
DEA: 030H3414
EFIS: 0317000152
Supplier: Jobsite
05/22/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality AssuranceCT072CR5WA

2020-05-22-2
Project ID: 213598
DEA: 051F75U4
EFIS: 0518000092
Supplier: Scougal Rubber
05/22/202005/26/2020SMTL TM1 - Elastomeric Bearing PadCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance18736-1

1:ASTM-D-2240 v05re10 (hardness) *
CT HQ - Sacramento Structural Materials Testing Laboratory
2:ASTM-D-412 v06a-re13 (tensile test) *
CT HQ - Sacramento Structural Materials Testing Laboratory
3:ASTM-D-624 v00-re12 (tear test) *
CT HQ - Sacramento Structural Materials Testing Laboratory
4:SMTL-- v06 (bilstein test)
CT HQ - Sacramento Chemistry Laboratory

2020-05-22-6
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: Watson Bowman
05/22/202005/26/2020SMTL TM2 - Type B Elastomeric Joint SealCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance1120228

2020-05-22-7
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: Watson Bowman
05/22/202005/26/2020SMTL TM2 - Type B Elastomeric Joint SealCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance1220228

2020-05-22-8
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: Watson Bowman
05/22/202005/26/2020SMTL TM2 - Type B Elastomeric Joint SealCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance0920227

2020-05-22-9
Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
Supplier: CalPortland Garey Hot Plant
05/22/202005/26/2020Hot Mix AsphaltCT D05 - Field LaboratoryQuality AssuranceType A HMA20-A-0462020-05-22-5
Project ID: 210837
DEA: 080J0804
EFIS: 0800000283
COOP: 081625
Supplier: NOT PROVIDED
05/21/202005/22/2020ConcreteCT - Southern Regional Field LaboratoryQuality AssuranceG3-18-PCC-135974-179

1:ASTM-C-39 v17a (compressive strength)
CT - Southern Regional Field Laboratory

2020-05-21-17
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/21/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604645

1:ASTM-C-39 v17a (compressive strength)
CT HQ - Sacramento Concrete Testing Laboratory

2020-05-21-10
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/21/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604645

2020-05-21-11
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/21/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604645

2020-05-21-12
Project ID: 213411
DEA: 030H10U4
EFIS: 0317000246
Supplier: Jobsite
05/21/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurance1604645

1:ASTM-C-39 v17a (compressive strength)
CT HQ - Sacramento Concrete Testing Laboratory

2020-05-21-9
Project ID: 213764
DEA: 080F0304
EFIS: 0800020358
Supplier: Robertsons
05/21/202005/26/2020ConcreteCT - Southern Regional Field LaboratoryQuality AssuranceSC675B381003-521

1:ASTM-C-39 v17a (compressive strength)
CT - Southern Regional Field Laboratory

2020-05-21-16
Project ID: 211235
DEA: 054482U4
EFIS: 0500000543
Supplier: Dextra America CMC Rebar
05/21/202005/21/2020SMTL TM5 - CouplersCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance 

1:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-21-1
Project ID: 211235
DEA: 054482U4
EFIS: 0500000543
Supplier: Dextra America CMC Rebar
05/21/202005/21/2020SMTL TM5 - CouplersCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance 

1:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-21-2
Project ID: 212914
DEA: 031E0604
EFIS: 0312000068
Supplier: CMC HRC
05/21/202005/26/2020SMTL TM5 - CouplersCT HQ - Sacramento Structural Materials Testing LaboratoryQuality Assurance 

1:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:CTM--670 vDecember 2013 (cyclical with slip)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-21-15
Project ID: 213569
DEA: 024F2104
EFIS: 0212000072
Supplier: Camblin
05/21/202005/22/2020SMTL TM5 - Headed BarsCT QASI - Sacramento Field LaboratoryAcceptanceA182386

1:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-21-6
Project ID: 213569
DEA: 024F2104
EFIS: 0212000072
Supplier: Camblin
05/21/202005/22/2020SMTL TM5 - Headed BarsCT QASI - Sacramento Field LaboratoryAcceptanceA163671

1:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:ASTM-A-970 v15e1 (headed bar tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-21-7
Project ID: 0
DEA: No Project
Supplier: Blue Circle Corporation
05/21/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryStock

2020-05-21-3
Project ID: 0
DEA: No Project
Supplier: Blue Circle Corporation
05/21/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryStock

2020-05-21-4
Project ID: 0
DEA: No Project
Supplier: Blue Circle Corporation
05/21/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryStock

2020-05-21-5
Project ID: 0
DEA: No Project
Supplier: Blue Circle Corporation
05/21/2020SMTL TM3 - Fastener AssemblyCT QASI - Los Angeles Field LaboratoryStock

2020-05-21-8
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: AAA-Corona
05/21/202005/22/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceRHMA-G

2020-05-21-21
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/21/202005/22/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-21-18
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/21/202005/22/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-21-19
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/21/202005/22/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-21-20
Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
Supplier: CalPortland Garey Hot Plant
05/21/2020Hot Mix AsphaltCT D05 - Field LaboratoryQuality AssuranceType A HMA20-A-0432020-05-21-13
Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
Supplier: CalPortland Garey Hot Plant
05/21/202005/26/2020Hot Mix AsphaltCT D05 - Field LaboratoryQuality AssuranceType A HMA20-A-0452020-05-21-14
Project ID: 212889
DEA: 073009U4
EFIS: 0714000238
Supplier: All American Asphalt Irvine
05/20/202005/26/2020AggregateCT - Southern Regional Field LaboratoryAcceptance91-33-0005::ALL AMERICAN ASPHALT0274G-20

2020-05-20-8
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-00520-166 1x4

1:CTM--202 vNovember 2011 (sieve analysis)
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--227 vDecember 2014 (cleanness)
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-13
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-00520-166 3-8

1:CTM--202 vNovember 2011 (sieve analysis)
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--227 vDecember 2014 (cleanness)
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-14
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-00520-166 Sand

1:CTM--202 vNovember 2011 (sieve analysis)
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--217 vJune 2011 (sand equivalent)
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-15
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-000520-166 Sand

1:CTM--217 vJune 2011 (sand equivalent) *
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--202 vNovember 2011 (sieve analysis) *
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-18
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-000520-166 1x4

1:CTM--202 vNovember 2011 (sieve analysis) *
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--227 vDecember 2014 (cleanness) *
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-19
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020AggregateTrinity Engineering Laboratories, Inc. - FresnoQuality Control91-10-000520-166 3-8

1:CTM--202 vNovember 2011 (sieve analysis) *
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--227 vDecember 2014 (cleanness) *
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-20
Project ID: 214314
DEA: 081F6904
EFIS: 0815000016
Supplier: All American Asphalt
05/20/202005/21/2020AggregateCT - Southern Regional Field LaboratoryVerification91-33-0005::ALL AMERICAN ASPHALT0265G-20

1:AASHTO-T-27 v14 (sieve analysis)
CT - Southern Regional Field Laboratory
2:AASHTO-T-335 v09r13 (Crushed Particles)
CT - Southern Regional Field Laboratory
3:AASHTO-T-85 v13 (SG and absorption)
CT - Southern Regional Field Laboratory
4:AASHTO-T-84 v14 (SG and absorption)
CT - Southern Regional Field Laboratory
5:AASHTO-T-96 v02r10 (abrasion)
CT - Southern Regional Field Laboratory
6:AASHTO-T-176 v08 (sand equivalent)
CT - Southern Regional Field Laboratory
7:ASTM-D-4791 v10 (Particles)
CT - Southern Regional Field Laboratory
8:AASHTO-T-304 v11 (uncompacted void content)
CT - Southern Regional Field Laboratory

2020-05-20-3
Project ID: 210673
DEA: 042640F4
EFIS: 0400020132
COOP: 042308A3
Supplier: Collected at jobsite
05/20/202005/22/2020ConcreteCT HQ - Sacramento Concrete Testing LaboratoryQuality Assurancemix 4700

2020-05-20-4
Project ID: 214292
DEA: 060Q9004
EFIS: 0614000047
Supplier: Outback Materials
05/20/202005/20/2020ConcreteTrinity Engineering Laboratories, Inc. - FresnoQuality Control72T1X10

1:ASTM-C-143 v15a (slump)
Trinity Engineering Laboratories, Inc. - Fresno
2:CTM--504 vJune 2010 (pressure method)
Trinity Engineering Laboratories, Inc. - Fresno
3:CTM--521 vJune 2012 (compressive strength)
Trinity Engineering Laboratories, Inc. - Fresno
4:CTM--518 vJune 2010 (unit weight)
Trinity Engineering Laboratories, Inc. - Fresno

2020-05-20-16
Project ID: 214515
DEA: 024F6004
EFIS: 0213000012
Supplier: Dynamic Rubber
05/20/202005/22/2020SMTL TM1 - Elastomeric Bearing PadCT HQ - Sacramento Structural Materials Testing LaboratoryQuality AssuranceCR55-008-20

1:ASTM-D-2240 v05re10 (hardness)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:ASTM-D-412 v06a-re13 (tensile test)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:ASTM-D-624 v00-re12 (tear test)
CT HQ - Sacramento Structural Materials Testing Laboratory
4:SMTL-- v06 (bilstein test)
CT HQ - Sacramento Chemistry Laboratory

2020-05-20-10
Project ID: 3825
DEA: 07138204
EFIS: 0700000142
Supplier: DSI Farrar
05/20/202005/26/2020SMTL TM6 - Ductile Iron Cast SamplesCT HQ - Sacramento Structural Materials Testing LaboratoryQuality AssuranceD080, B250, C110, C040

1:ASTM-A-370 v15 (rounded sample tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory

2020-05-20-9
Project ID: 88888
DEA: STOCK
EFIS: STOCK
Supplier: UIS
05/20/202005/21/2020SMTL TM3 - Fastener AssemblyCT QASI - Sacramento Field LaboratoryQuality Assurance

1:ASTM-A-370 v15 (rounded sample tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
2:ASTM-A-370 v15 (rounded sample tensile)
CT HQ - Sacramento Structural Materials Testing Laboratory
3:ASME-B-1.2 v83r01 (Ring Gage)
CT HQ - Sacramento Structural Materials Testing Laboratory
4:ASME-B-1.2 v83r01 (Ring Gage)
CT HQ - Sacramento Structural Materials Testing Laboratory
5:ASME-B-1.2 v83r01 (Ring Gage)
CT HQ - Sacramento Structural Materials Testing Laboratory
6:ASME-B-1.2 v83r01 (Ring Gage)
CT HQ - Sacramento Structural Materials Testing Laboratory
7:ASME-B-1.2 v83r01 (Ring Gage)
CT HQ - Sacramento Structural Materials Testing Laboratory
8:ASTM-B-499 v14 (Coating Thickness)
CT HQ - Sacramento Structural Materials Testing Laboratory
9:ASTM-B-499 v14 (Coating Thickness)
CT HQ - Sacramento Structural Materials Testing Laboratory
10:ASTM-B-499 v14 (Coating Thickness)
CT HQ - Sacramento Structural Materials Testing Laboratory
List is truncated. Click on DIME Sample ID to view all Tests.

2020-05-20-1
Project ID: 214466
DEA: 081F1414
EFIS: 0815000231
Supplier: CCA-Lake Elsinore
05/20/202005/21/2020Hot Mix AsphaltCT - Southern Regional Field LaboratoryAcceptanceType A HMA

2020-05-20-21
Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
Supplier: CalPortland Garey
05/20/202005/20/2020Hot Mix AsphaltCT D05 - Field LaboratoryAcceptanceType A HMAD5 20-A-0382020-05-20-2
Project ID: 214520
DEA: 051H9804
EFIS: 0517000043
Supplier: CalPortland Garey Hot Plant
05/20/2020Hot Mix AsphaltCT D05 - Field LaboratoryQuality AssuranceType A HMA20-A-0422020-05-20-6
Project ID: 212789
DEA: 044H5804
EFIS: 0413000162
Supplier: Reed and Graham, Inc
05/20/202005/28/2020Asphaltic EmulsionCT HQ - Sacramento Asphalt Binder LaboratoryAcceptanceSS-1h

2020-05-20-12
Project ID: 213942
DEA: 051F7004
EFIS: 0514000055
Supplier: Pacific Northwest Oil - Stockton, CA
05/20/202005/29/2020Asphaltic EmulsionCT HQ - Sacramento Asphalt Binder LaboratoryAcceptanceSS-1h

2020-05-20-17